Why it's different

Power that gives back

Six reasons on-site power from Hyperion works for the people around it.

 
Get a quote

Fuel flexible

6levels of protection

Six fuels, one engine. Our learning ECU watches prices, supply and demand, then switches fuels on its own. Tap or hover a fuel to learn more.

Hyperion V12 smart engine
Status
Fuel response
Runs on any one fuel  ·  Switches when it pays  ·  AI-powered ECU
Inside the Hyperion container: two V12 gensets Hyperion 1 MW power plant in its 40 foot container enclosure
Sound Attenuation
1 - 5 MW / Container

Smart engine · patent pending

Twelve weights. Your priorities.

Tell the engine what matters most. It balances twelve goals, from cost to quiet hours, and picks the right fuel mix every minute. Pick a profile, or just move your cursor around the wheel.

Resulting fuel mixIllustrative

Proven technology

Engines are winning

Large gas turbines are sold out to 2031. Reciprocating engines start in minutes, stay efficient at part load and ship in a fraction of the time. That's the engine inside every Hyperion generator.

Race to power · months from order

0MIN
To full power
Large gas engines reach full output in under 3 minutes; standard units in about 5.
0% LOAD
And still efficient
Engines run at 25% load or lower without giving up fuel efficiency.
0M
Full output at altitude
Engines hold rated output up to 1,000 m. Industrial turbines lose about 10%.
0BAR
Gas pressure needed
Turbines need 21–40 bar, so engines sit closer to the load with less piping and risk.

Gas turbine backlog, GE Vernova (GW)

Engine power market ($B)

0WATER
In the cycle
Reciprocating engines use no water to make power.
0%
Availability
Typical for engines in stationary power, per the EPA.

Sources: GE Vernova Q2 2026 results via Enverus and MarketsandMarkets · Mitsubishi Power lead times via Energy News Beat / Bloomberg · Small turbine lead times, Utility Dive / EPRI · Start time, INNIO Jenbacher · Part load, altitude, gas pressure, Power Engineering and Power Engineering / Sargent & Lundy · Availability, EPA CHP Catalog · Market size, Global Market Insights. Hyperion: 8 week standard delivery.

Speed to market

Faster power

Every month without power is a month your project stands still. Hyperion ships in as little as 8 weeks. Everyone else keeps waiting.

HYPERION8 week delivery + $0M POWER ON COMPETITORSTypical delivery, ~3.5 years - $0M UTILITY UPGRADEUp to 5 years - $0M * Est. revenue earned or lost waiting on power, 10 MW installation. Same basis as the Home page chart.
0
months from order

3Levels of Excellence

Hyperion Core generator in a dark studio Hyperion Pro generator in a dark studio Hyperion Ultra generator with solar in a dark studio
Order Now

Service & support

Global network

Hyperion is partnered with OEM Engine & Generator Manufacturers to deliver market-leading build-quality, durability, service, and maintenance around the world.

Get a quote
Hyperion

Smart Power